In the last three years, the company "Izoprogres" A.D. has developed the refractory services in cooperation with its partners, using top-quality attested materials at the Client’s orders. During that period, it has successfully carried out works on the following plants:

TENT A:

  • Ceiling repair work of boiler walls, burners and roast
  • Recirculation channel, block A4 coal burner
  • Block 4 major overhaul (2007)
  • Block 6 major overhaul (2008)
  • Improvement of fire-proof construction within the block A2 overhaul (2008)
  • Overhaul of fire-proof construction on blocks A1 and A5 (2008)
  • Overhaul of fire-proof construction on blocks A1, A2, A3, A4, A5 and A6 (2009)
  • Repair of refractory structures, recirculation channels, coal burners, growth burner fuel oil, boiler hoppers, units: A1: A5 in 2010. - Built 50 tonnes of concrete (2010)
  • Overhaul - unit A6 for 2010. year - Built 1350 tonnes of concrete (2010)
  • Repair of refractory structures, recirculation channel burner of coal, fuel oil burners, economizer walls, flame bridges, boiler walls firebox on units: A1: A6 in 2011. - Built-in 330 tonnes of concrete (2011)
  • Repair of refractory structures, recirculation channel burner of coal, fuel oil burners growth, the ceiling of the boiler, economizer walls, flame bridges, walls, boilers and others. Units 1, 2, 3, 4, 5, 6 TENT A - Built-in 362 tonnes of concrete (2012)
  • Units 1-6, refractory construction TENT-A, repair and maintenance: recirculation channels, coal burners, heavy oil burner, fiery bridges, boiler walls, ceiling boilers and others on TENT A - Obrenovac (2013)
  • Repair of refractory construction units A1-A6 (2014)
  • Refractory construction A3 - Built 365 tonnes of concrete (2014)
  • Repair of refractory structures A1, A2, A4, A5 and A6 - Built 470 tonnes of concrete (2014)

TENT B:

  • Works on the recirculation channel lining overhaul using coal dust burners, funnel roast and block B2 mill doors
  • Block B1 capital overhaul (construction works)
  • Works on the recirculation channel lining overhaul using coal dust burners, funnel roast and block B1 and B2 mill doors
  • Block B1 and B2 refractory works (year 2008 and 2009)
  • Works on the recirculation channel lining overhaul, coal dust burners, ash hoppers and, mill doors - unit B2 - Built 89 tonnes of concrete (2010)
  • Rehabilitation of refractory walls in recirculating plant unit B1 - 420 tonnes of concrete (2012)
  • Refractory works during the overhaul of unit B1 and unit B2 - 210 tonnes of concrete (2012)

TEPP Kostolac

  • Chimney maintenance - improvement of the 17th plate of the chimney (2008)
  • Adaptation unit TEKO B2 with reconstruction of electrostatic precipitators - refractory works during the 2010s - built in 230 tonnes of concrete (2010)

TEPP Kolubara

  • Refractory works on boiler 6 lining - 2004

Oil refinery Novi Sad:

  • Boiler 2 refractory
  • Furnace H-2601 improvement on the secondary process plant in RNS (2008)