  • Replacement of refractory lining in recirculation ducts within the first phase of revitalization of block B2 in 2016, TENT B. Installed: Refractory bricks, concrete, mortar and other material - 1600t, refractory steel - 63t
  • Successfuly finished major overhault in Oil Refinery Pancevo (S-2100, S-2200), where we performed scaffolding, insulation and refractory works (August - September 2016)
  • Signed and finished design for thermal insulation on Power plant Kostolac Drmno, Unit B1.
  • Signed and finished design for thermal insulation coal dust burners, air mixture, secondary air and "OFA" channels on Power plant Kostolac Drmno, Unit B1.
  • Sucessfully finished thermal insulation and scaffolding works on major overhaul unit B1 on TEKO B in Kostolac (contract with Chinese company "CMEC"), in which was made 35.000m2 new insulation, and mounted and dismantled 70.000m2 of scaffolding.
  • Sucessfully finished thermal insulation and scaffolding works on major overhaul unit A3 on TENT A in Obrenovac in which was made about 17.200m2 of new insulation, mounted and dismantled 60.000m2 of scaffolding and installed about 1102 tons of refractory material (concrete, steel minwral wool..)
    As part of overhaul we made the replacement of refractory construction of six recirculation channels, ash hopper and manholes.
    Also as part of the overhaul unit TENT A1 we replaced turbine insulation in the amount of 800m2 (May - October 2014)
  • Succesfuly finished major overhaul on TENT A Obrenovac, Unit 5, where about 16000m2 thermal insulation and 43000 m2 of scaffolding is made.
  • Finished overhaul on TENT B Usce, Unit B1.
  • In January held instruction for handling the CNC Cutting machine for 5 Izoprogres workers.
  • In December 2012 maintained course for technical drawing in AutoCad 3D for 5 Izoprogres workers.
  • Introduced Occupational health & safety Management system certificate OHSAS 18001 (jun 2011)
  • Adoption of Health Protection and Safety Management System according to Standard SRPS OHSAS 18001/2008 in progress (May 2011)
  • Signed contract for thermal insulation, scaffolding and refractory works in reconstruction of Unit A6 - TENT Obrenovac (jun 2010)
  • Signed contracts and beginning insulation works for maintaining on Power plants TENT A and TENT B - all units (april 2010)
  • Signed contract and all works in progress for yearly overhaul on TENT A, Unita A1-A5 (march 2010)
  • Signed contract and all works in progress in refractory works for yearly overhaul on TENT B, Unita B1-B2 (march 2010)
  • All works in progress in insulation and scaffolding works on electrical precipator on Unit A6 (march 2010)
  • Extended validity of SRPS ISO 9001/2008 certificate (february 2010)
  • Signed contract and all works in progres in insulation and scaffolding works for yearly overhaul on TENT B, Unit B1-B2 (march 2010)
  • Successfully continuated scaffolding works of our company in Hamburg - Germany (since february 2010)
  • Finalised refractory works on block B1 at the thermal electric power plant TENT B (June 2009)
  • Finalised refractory works within the overhaul on blocks A2, A3 and A4 at TENT Obrenovac (June 2009)
  • Finalised insulation works within the overhaul on blocks A2, A3 and A4 at TENT Obrenovac (June 2009)
  • Extension of the scope of the SRPS ISO 9001/2008 certificate. The quality management system can now be applied to insulation and scaffolding works in processing installations (May 2009)
  • Joint company "GST - STEEL Izoprogres" was founded in cooperation with the German company "GST-STEEL" for providing scaffolding works (March 2009)
  • Bought electric pump torque machine with a compressor for refractory works (December 2008)
  • Bought truck industrial vacuum cleaner type "Disab Centurion P/ 9-1812 HT BLOW/VAC". (December 2008)
  • Finalised thermal insulation and refractory works within phase 1 of block 6 reconstruction at TENT Obrenovac (December 2008)
  • Belgrade Stock-Exchange - Prospekt the company "Izoprogres" A.D. (Belex)
  • Belgrade Stock-Exchange - Prospekt the company "Izoprogres" A.D. (KBK Broker)
  • Other news from finance and share holding activities - Belex